Data Center Migrations
Legacy to new data center migrations with full-stack conversion, DNS readiness, and gateway swings.
Experience
60+
Legacy-to-new data center engagements
85+
DC & cloud migration engagements overall
- Replication patterns (including Zerto S2S where applicable)
- Full-stack configuration conversion
- DNS readiness, cutovers & gateway swings
- Day-0 Migration Support
Cloud Repatriation & Cloud Migrations
Moves in both directions—cloud workloads brought back on-prem, and on-prem workloads moved to the cloud—planned around connectivity, identity/DNS dependencies, and a cutover path that stays quiet.
Experience
15+
Cloud repatriations (cloud to on-prem)
10+
Cloud migrations (on-prem to cloud)
- Hybrid connectivity planning tied to the migration wave
- Dependency mapping before drawings get precious
- Rollback-aware cutover sequencing
Site Decommissioning & E-Shred
Orderly cage and site evacuation after cutover: equipment de-install, asset inventory and reconciliation, circuit disconnects, and certified e-shred/data destruction with chain-of-custody documentation.
- Sequenced after a stable cutover, not before
- Asset records reconciled against what leaves the floor
- Destruction and disposal documentation for your records
Tech Debt Mitigation & Solution Design
Transformations fail quietly when debt rides along for free. Glidepath pairs migration scope with mitigation and solution design: what to retire, what to standardize, and what must be rebuilt cleanly.
- Debt inventory tied to real risk (not endless backlog theater)
- Mitigation plans sequenced with the move
- Solution design that prefers operable standards over one-off heroics